Eric Arthur Blair Posted July 20, 2022 Report Share Posted July 20, 2022 "Unheated". Going to be lovely from November to March. Quote Link to comment Share on other sites More sharing options...
Eric Arthur Blair Posted July 20, 2022 Report Share Posted July 20, 2022 Planning application and drawings available here. Quote Link to comment Share on other sites More sharing options...
Callum Gilhooley Posted July 20, 2022 Report Share Posted July 20, 2022 (edited) Ok , am I looking at these plans and reading them correctly ? if not, please correct me. There doesn’t appear to be toilet facilities in the drawing or mentioned in the description ( again , i may have missed it) Also, as EAB has commented, no heating ? Really ? Lastly , if they’re going to have these in place for the start of the season, they’re gonna have to get a wiggle on 😂 Edited July 20, 2022 by Callum Gilhooley Quote Link to comment Share on other sites More sharing options...
Langbank Posted July 20, 2022 Report Share Posted July 20, 2022 12 minutes ago, Callum Gilhooley said: Ok , am I looking at these plans and reading them correctly ? if not, please correct me. There doesn’t appear to be toilet facilities in the drawing or mentioned in the description ( again , i may have missed it) Also, as EAB has commented, no heating ? Really ? Lastly , There is mention of vapour barrier on w/c side of partition. Maybe that means something else ?? Also see that electrical installation has to comply with 16th edition, we are now onto 18th edition I think. Quote Link to comment Share on other sites More sharing options...
Callum Gilhooley Posted July 20, 2022 Report Share Posted July 20, 2022 20 minutes ago, Langbank said: There is mention of vapour barrier on w/c side of partition. Maybe that means something else ?? Also see that electrical installation has to comply with 16th edition, we are now onto 18th edition I think. I suppose we will have to wait n see. Have to say , if punters have to traipse through to the family stand and back for a pee in the winter weather it’s not exactly executive . If that’s the case . Quote Link to comment Share on other sites More sharing options...
Guest Posted July 20, 2022 Report Share Posted July 20, 2022 1 hour ago, Callum Gilhooley said: Lastly , if they’re going to have these in place for the start of the season, they’re gonna have to get a wiggle on 😂 I believe the intention is to have them ready for season 2023/24. Quote Link to comment Share on other sites More sharing options...
santaponsasaint Posted July 21, 2022 Report Share Posted July 21, 2022 I believe the intention is to have them ready for season 2023/24.Be ready for the championship then. Sent from my SM-A526B using Tapatalk Quote Link to comment Share on other sites More sharing options...
Sonny Posted July 21, 2022 Author Report Share Posted July 21, 2022 I would think that unheated refers to no central heating (gas or oil). Doesn't rule out portable electrical heating.Sent from my SM-G935F using Tapatalk Quote Link to comment Share on other sites More sharing options...
Callum Gilhooley Posted July 21, 2022 Report Share Posted July 21, 2022 9 hours ago, SuperSaints1877 said: I believe the intention is to have them ready for season 2023/24. Obviously a mistake on the press release and website , says “ahead of the 2022-23 season” on there 🙄 Quote Link to comment Share on other sites More sharing options...
Guest Posted July 21, 2022 Report Share Posted July 21, 2022 30 minutes ago, Callum Gilhooley said: Obviously a mistake on the press release and website , says “ahead of the 2022-23 season” on there 🙄 Nah. I reckon the timescales will still be for next season based on press release. It seems like they have missed the boat for this season and these dates on the application were probably the original intention if that makes sense. Quote Link to comment Share on other sites More sharing options...
HSS Posted July 21, 2022 Report Share Posted July 21, 2022 13 hours ago, Callum Gilhooley said: Lastly , if they’re going to have these in place for the start of the season, they’re gonna have to get a wiggle on 😂 I’m quite sure the box will be totally fitted out off site before being dropped into position and hooked up/plumbed in to electricity/water Shouldn’t take long to do that Quote Link to comment Share on other sites More sharing options...
waldorf34 Posted July 22, 2022 Report Share Posted July 22, 2022 On 7/21/2022 at 8:48 AM, SuperSaints1877 said: Nah. I reckon the timescales will still be for next season based on press release. It seems like they have missed the boat for this season and these dates on the application were probably the original intention if that makes sense. They applied for planning permission 15th July Quote Link to comment Share on other sites More sharing options...
beyond our ken Posted July 22, 2022 Report Share Posted July 22, 2022 On 7/21/2022 at 8:10 AM, Sonny said: I would think that unheated refers to no central heating (gas or oil). Doesn't rule out portable electrical heating. Sent from my SM-G935F using Tapatalk Think you are right in that. If they declare them as heated then the base needs to be built to a very high standard. in any event they will be hard to heat. In that structure the temperature fluctuates wildly in the winter from Baltic to balmy Quote Link to comment Share on other sites More sharing options...
faraway saint Posted July 22, 2022 Report Share Posted July 22, 2022 1 minute ago, beyond our ken said: Think you are right in that. If they declare them as heated then the base needs to be built to a very high standard. in any event they will be hard to heat. In that structure the temperature fluctuates wildly in the winter from Baltic to balmy Not sure about that, if well insulated they would heat up pretty quickly and, as it's not a massive area will stay ok for the time they are used. Suppose constant opening the door could let the heat out. Maybe a duffle coat will be supplied, just in case? Quote Link to comment Share on other sites More sharing options...
Rascal Posted July 22, 2022 Report Share Posted July 22, 2022 Black and white throws for the boxes Quote Link to comment Share on other sites More sharing options...
Callum Gilhooley Posted July 22, 2022 Report Share Posted July 22, 2022 Damn , Morton have beaten us to it 😡 Quote Link to comment Share on other sites More sharing options...
truesaint Posted July 23, 2022 Report Share Posted July 23, 2022 Morton are way ahead of us with their individual exclusive boxes. You can even get one for sitting in your regular seat and only cost a fiver per match. Quote Link to comment Share on other sites More sharing options...
truesaint Posted January 9, 2023 Report Share Posted January 9, 2023 https://www.stmirren.com/commercial-news/4736-club-statement-executive-boxes Quote Link to comment Share on other sites More sharing options...
beyond our ken Posted January 9, 2023 Report Share Posted January 9, 2023 "Unfortunately, the detailed costings for the planned approach came in at almost double that first indicated. As such the Club Board has reluctantly decided to shelve the plans for now and investigate alternative options" For such a simple build, a doubling of the price seems incredible. It's probably best to disengage with the contractor and forget this proposal completely. Quote Link to comment Share on other sites More sharing options...
Albanian Buddy Posted January 9, 2023 Report Share Posted January 9, 2023 19 minutes ago, beyond our ken said: "Unfortunately, the detailed costings for the planned approach came in at almost double that first indicated. As such the Club Board has reluctantly decided to shelve the plans for now and investigate alternative options" For such a simple build, a doubling of the price seems incredible. It's probably best to disengage with the contractor and forget this proposal completely. Or get someone in the club who is commercially astute and can understand actual deployment costs before selling these facilities to companies. Highly unprofessional. Quote Link to comment Share on other sites More sharing options...
Albanian Buddy Posted January 9, 2023 Report Share Posted January 9, 2023 The academy refurb was due to cost around £80K iirc. Those costs have far exceeded that original estimation. Quote Link to comment Share on other sites More sharing options...
munoz Posted January 9, 2023 Report Share Posted January 9, 2023 1 hour ago, truesaint said: https://www.stmirren.com/commercial-news/4736-club-statement-executive-boxes Bullet dodged. They looked terrible. Quote Link to comment Share on other sites More sharing options...
Cookie Monster Posted January 9, 2023 Report Share Posted January 9, 2023 The academy refurb was due to cost around £80K iirc. Those costs have far exceeded that original estimation. That was also down to the enlarged facilities the club eventually got. Quote Link to comment Share on other sites More sharing options...
Cairters_Corner Posted January 9, 2023 Report Share Posted January 9, 2023 1 hour ago, beyond our ken said: "Unfortunately, the detailed costings for the planned approach came in at almost double that first indicated. As such the Club Board has reluctantly decided to shelve the plans for now and investigate alternative options" For such a simple build, a doubling of the price seems incredible. It's probably best to disengage with the contractor and forget this proposal completely. Quote Link to comment Share on other sites More sharing options...
Cairters_Corner Posted January 9, 2023 Report Share Posted January 9, 2023 There’s a demand for these with one company already signed up for one. Hopefully the club can get an alternative in place. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.